MODEL
XRDB
Hydrostatic transmission flushing assembly with cross-port relief
CAPACITY: 40 L/min.
Continued from
previous page
(L)CONTROL
L Standard Screw Adjustment
C Tamper Resistant - Factory Set
Y Tri-Grip Handknob
(A)ADJUSTMENT RANGE
A 500 - 3000 psi (35 - 210 bar), 1000 psi (70 bar)
Standard Setting
W 800 - 4500 psi (55 - 315 bar), 1000 psi (70 bar)
Standard Setting
B 300 - 1500 psi (20 - 105 bar), 1000 psi (70 bar)
Standard Setting
C 1000 - 6000 psi (70 - 420 bar), 1000 psi (70 bar)
Standard Setting
D 200 - 800 psi (14 - 55 bar), 400 psi (28 bar) Standard
Setting
E 100 - 400 psi (7 - 28 bar), 200 psi (14 bar) Standard
Setting
S 50 - 200 psi (3,5 - 14 bar), 100 psi (7 bar) Standard
Setting
(N)SEAL MATERIAL
N Buna-N
E EPDM
V Viton
(A)
(W)
OPTION SELECTION EXAMPLE: XRDBLANAW
PRIMARY CARTRIDGE
A A (with RDDA primary cartridge, Direct-acting relief valve)
A A (with RDDA3 primary cartridge, Non-adjustable direct-acting relief valve)
PORT DESIGNATORS
Modifiers Ports
W, W/S Ports 1 & 2: 3/4" BSPP; Port T: 3/8" BSPP; Gage Ports: 1/4" BSPP; Mounting Holes: M10 x 1.5-6H x .62 DP;
3, 3/S Ports 1 & 2: 3/4" Code 62; Port T: SAE 8; Gage Ports: SAE 6; Mounting Holes: .375 - 16UNC x .75 DP;
3/M, 3/T Ports 1 & 2: 3/4" Code 62; Port T: 3/8" BSPP; Gage Ports: 1/4" BSPP; Mounting Holes: M10 x 1.5-6H x .75 DP;
L, L/S Ports 1 & 2: SAE 12; Port T: SAE 8; Gage Ports: SAE 6; Mounting Holes: .375 - 16UNC x .62 DP;
O, O/S Ports 1 & 2: 3/4" Code 61; Port T: SAE 8; Gage Ports: SAE 6; Mounting Holes: .375 - 16UNC x .75 DP;
O/M, O/T Ports 1 & 2: 3/4" Code 61; Port T: 3/8" BSPP; Gage Ports: 1/4" BSPP; Mounting Holes: M10 x 1.5-6H x .75 DP;
MATERIAL DESIGNATOR No modifier - inch, aluminum /S - Inch, Ductile Iron /M - Metric, Aluminum /T - Metric, Ductile Iron
INCLUDED COMPONENTS
Part Description Quantity
DSCHXHN Cartridge 1
RDDALAN Cartridge - Primary 2
RPECLNN Cartridge 1
TECHNICAL FEATURES
A unique feature of the hot oil shuttle is that the setting of the hot oil relief can be confirmed or adjusted when the transmission is in neutral.
The two ports marked 1 are common as are the two marked 2. Therefore the assembly can be teed off the loop rather than being plumbed into the loop.
The two ports marked 1 are common as are the two marked 2. The high pressure relief that is physically on the same side as port 1 controls the pressure on port 2
and vice versa.
When the transmission is in neutral the charge pressure is controlled by the charge pump relief. When the hot oil shuttle opens, some or all of the charge pump
flow is redirected to the hot oil relief. The charge pump relief must be set higher than the hot oil relief to produce hot oil flow. The higher the differential pressure
between the 2 reliefs, the higher the hot oil flow. The amount of hot oil flow is determined by the pressure vrs flow curves of the 2 reliefs and is difficult to quantify.
The standard setting of the hot oil relief is 200 psi (14 bar) at a flow of 4 gpm (16 L/min).
Hydraulic motors leak. Therefore a mechanical brake is recommended to positively lock any stopped live load.
PRIMARY CARTRIDGE CONFIGURATION